Monday, 17 July 2023

Station Building Completed


Ready for the Welsh 009 layout, the Abergynolwyn inspired station building. Wills slate roof pieces finish it off nicely from when it was last seen, with a solvent soaked piece of paper for the ridge tiles. Given an all over coat of tank grey, odd slates picked out in Revell dark grey, black green and greyish green & all blended together with a wash of matt black.


Gutters, downpipes and the bench come from the Peco windows and doors pack, all cut down to a suitable size. The bargeboards are cut from 20thou sheet. The shelter support is a length of 60thou square strip with a small scquare of 20thou plastic sheet as a foot.


Structurally finished, the building may receive a few more details once in situ on the layout, most probably the addition of a timetable board on one of the walls and possibly a name-board. Time will tell.

No comments:

Post a Comment